This package falls under the World Bank-financed Indonesia National Urban Flood Resilience Project (NUFReP, IBRD Loan 9459-ID), tendered by the Ministry of Public Works' BP2JK East Java working group (Pokja 38A). The scope is civil works for the Malang City urban drainage system (ID-BWS Brantas-568647-CW-RFB).
Procurement is National Open Competitive with post-qualification. Cast-in-place and precast concrete concentrates on drainage box culverts, inspection chambers and pump-station structures, creating steady demand for PCE superplasticizers with reliable water reduction and slump retention; in the hot-humid climate, retardation and crack-control packages should be considered alongside.
Opportunity for suppliers: both local ready-mix plants and contractors are viable entry points. Bids close 2026-09-24 — the window is tight, so lead with technical data sheets plus cement-compatibility test reports when approaching East Java contractors. Details are subject to the LPSE e-procurement documents; this entry is sourced from a public TenderPipe notice and is for lead-reference only.